Brisbane Markets Roof
Client: Wiley
Tonnage: 230T
Date Project Commenced: November 2014
Duration of Scope: 6 Months
Description:
Supply of Shop Drawings and the Supply, Fabrication, Surface Protection and Installation of Structural Steel trusses for the new roof at Brisbane Markets, Rocklea. Triangular trusses were fabricated using CHS sections with different grid dimensions from bay to bay ensuring each truss was required to be custom made to fit these dimensions. Trusses were trial assembled in the workshop with no fabrication errors being recorded on site.
Tonnage: 230T
Date Project Commenced: November 2014
Duration of Scope: 6 Months
Description:
Supply of Shop Drawings and the Supply, Fabrication, Surface Protection and Installation of Structural Steel trusses for the new roof at Brisbane Markets, Rocklea. Triangular trusses were fabricated using CHS sections with different grid dimensions from bay to bay ensuring each truss was required to be custom made to fit these dimensions. Trusses were trial assembled in the workshop with no fabrication errors being recorded on site.