Brisbane International Airport Northern Expansion
Client: Laing O’Rourke
Tonnage: 1090 T
Date Project Commenced: December 2016
Description: Supply of Shop Drawings and the Supply, Fabrication, Surface Protection and installation of Structural Steelwork for Concourse Building and Fixed Links to Gate 73 and 74. Fixed Links were 60m long and weighed 125 tons each and lifted in place using a 450 ton crane.
Tonnage: 1090 T
Date Project Commenced: December 2016
Description: Supply of Shop Drawings and the Supply, Fabrication, Surface Protection and installation of Structural Steelwork for Concourse Building and Fixed Links to Gate 73 and 74. Fixed Links were 60m long and weighed 125 tons each and lifted in place using a 450 ton crane.