Supply, fabrication and installation of 1 Main process building consisting of welded beams &
columns portals, 1 pipe bridge, 3 x chemical storage buildings, 3 MCC Buildings, 1 Energex substation, 1
Pump house building, 316 stainless steel handrail and stair case to the entry of the main process building, 1
Lime building, Erect 4 x aluminium roof structures over treated water tanks, solids balance tanks and raw
water tanks approx 2500m2 aluminium roofs. |