Steel Fabrications Australia
Brisbane Steel Fabrications
HOME OUR SERVICES CASE STUDIES ABOUT US EMPLOYMENT MEDIA CONTACT US
Steel Fabrications bg
CASE STUDIES
Western Corridor Recycled Water Project- Gibson Island
Patricks Terminal - Brisbane
Western Corridor Recycled Water Project
MRTT HANGAR AMBERLEY
MRTT HANGAR AMBERLEY
MRTT HANGAR AMBERLEY
AUSTRALIA ZOO
BRISBANE BMW
PORCHE BRISBANE
DFO BRISBANE
CURRAGH NORTH
CARLTON UNITED BREWERIES WAREHOUSE
Woolworths
GCCEC Extension GCCEC Extension
GCCEC Extension GCCEC Extension
GCCEC Extension GCCEC Extension
GCCEC Extension GCCEC Extension
GCCEC Extension GCCEC Extension
GCCEC Extension
JOB: Extension of the Gold Coast Convention Centre - Broadbeach QLD
CLIENT: Laing ORourke
TONNAGE: 380 tonnes
DATE PROJECT COMMENCED: December 2007
DURATION OF SCOPE: 11 months
SPECIFICATION:
Welding: AS 1554.1 SP
Fabrication: AS 4100
Protective Coating: Abrasive Blast to AS 1627.4 Class 2 ½
System 1 484 Interprime 40 microns Internal structural steelwork
System 2 Interzinc 315 40 microns Interthane 990 Internal exposed steelwork
System 3 Interzinc 215 75 microns Acrylic black 40 microns Internal exposed steelwork
System 4 interzinc 315 75 microns 475 interguard 125 microns plant rooms steelwork
System 5 interzinc 315 75 microns 475 interguard 125 microns Exposed steelwork
System 6 Galvanized
DESCRIPTION:

Supply Manufacture of all structural steel work for the extension to the existing exhibition centre.

The Main Hall was constructed of 610 ub columns with 54 meter span roof trusses 6.7 meters deep These roof trusses were manufactured and fully welded in our Hemmant facility prior to being transported to the painting contractor then on to site for installation.

Erection of the trusses was a dual lift using 2 x 25 tonne cranes and a mini crane to assemble ties all site works and erection was under Steel Fabrications Australia site management at all times.

The eastern and western sections where completed after the main hall had precast panels erected.

Steel Fabrications Australia have a good working relationship Lang O'Rourke which has enabled the successful completion of this project while maintaining the operational success of the existing facility.

©2010 Steel Fabrications Australia.
Online Marketing and Identity by NBM.
MEMBERSHIPS
BSA
AWARDS
Australian Steel Institute
BRW Fast 100
SYSTEMS
FabTrol MRP
Tekla