Supply, fabrication and installation of 3 truss bridges carrying water pipes for the southern connector water
pipeline.
Caboolture Truss Bridge: 82m long fabricated in 7 truss section weighing a total of 112T
Warraba Truss Bridge: 42m long fabricated in 4 truss sections weighing a total of 36.5T
Mooloolah Truss Bridge: 30m long fabricated in 3 truss sections weighing a total of 26.7T
Truss bridges were fabricated in our Hemmant fabrication facility and trial assembled prior to leaving our workshop.
The project required detailed planning and communication with local residents and land holders as the pipeline passes thru built
up communities where transport and logistics issues affected the local residence on a daily basis. |